Architect's Impression of the Orcem "Green" Cement Facility |
Current Status: Withdrawn by developer
Description
Vallejo Marine Terminal sought to construct a deep-water terminal at 790 and 800 Derr Street. This project was seen as a joint operation between VMT and Orcem, who wanted to operate a cement factory at the same location. After being rejected by the Vallejo Planning Commission in 2017, VMT/Orcem filed an appeal. The City has sought to review their previous Environmental Impact Reort (EIR), but VMT/Orcem have refused to provide documents to assist in the City's review. Currently, the project is on hold.
Sources
Vallejo Times Herald
City of Vallejo Vallejo Marine Terminal/ORCEM EIR
ORCEM Vallejo Project
Comments
Post a Comment